Norwich Cycling Campaign

October Newsletter

Welcome to the October newsletter, sorry this newsletter is a little late, it's been an eventful month, all will be explained.

 

Winter is coming

That's not only something from Game of Thrones or a comment on the world situation, or even the horror show that is Tombland - more about that below - it's also a fact, summer is behind us and it's getting cold and dark early, Welcome to November. Remember, lights on and don the hi viz 

 

Membership renewal

Some time back when the world was a much saner place we decided to move the subscription date to October, to coincide with the AGM and to give us time to recruit some new members with the return of students for the new academic year.

This was a good idea, but then of course covid19 arrived and all our plans have been thrown into disarray. Anyway, memberships are due.

 

Membership

Without members of course, the campaign is pretty much meaningless, so we would like to encourage all our existing members to renew your annual membership now please. It costs a mere £10 a year per person, less than two pints in a pub if you can find one that's open.

Please pay via bacs if you can, the details are

Payee - Norwich cycling campaign
Sort code - 089299
Account number - 65219661

If you can't use bacs, please let me know and we'll sort something out. Please don't use our paypal account for the time being.

 

Annual General Meeting

November is the time we usually hold an AGM and invite everyone along, but of course this year we can't really do it, so it will have to be virtual as so may things have been this year

If you've never done a zoom link, all you have to do is click the link below at the time of the meeting and it should all work, although you may have to enter the meeting ID and passcode if prompted. You will need sound on your computer of course.  Please do attend, we'll send out a reminder closer to the date but put it in your diary!

Make a note of this information:

AGM

Date:  12th November (Thursday)
Time: 7.00pm (19:00)
Zoom invite link  https://zoom.us/j/92001677739?pwd=ZGVLVEVTSzlmL2JqNzRKVVo1TGpxUT09
Meeting ID: 920 0167 7739
Passcode: 628731

 

Membership drive

We had planned to recruit new members with a leafletting campaign - targeted at cyclists of course. The idea was to print some A5 flyers and hand them out to cyclists around the city and it the UEA, City College, NUA and so on. But of course the ongoing pandemic has made that difficult if not impossible. 

So we need your help. If you can print this poster and either display it in a window or find a shop window to put it up in  that would be great. Click the image for a full sized version.

Membership poster

You can see the flyer and poster on our website here

Tombland, an unfolding disaster of inept planning

Tombland

It's difficult to say much about the developments in Tombland whilst remaining polite. It's no exaggeration to say this terrible scheme has occupied a lot of our time over the last month and we have very little positive developments to report.

For almost a year now, as a result of our very public criticism of the half baked Prince of Wales cycle track we have been having quite a lot of meetings with officers from Norfolk County Council on a number of schemes in the hope of avoiding similar situations in the future. We have been happy to go along with this an the understanding that while we were discussing issues, we would be restrained in our public comments in the hope things could be resolved.

Then the development of Tombland started a couple of months ago. 

We had made strong representations about a number of issues at the planning enquiry but absolutely non of our concerns were taken on board. That was a couple of years back and now the work is underway.

Last month we outlined the chaos cyclists were faced with due to the works, absolutely no thought whatsoever had been given to accommodating cycling through the roadworks and important cycling route had been closed with zero consultation. The situation in Tombland with regard to traffic management of cyclists can only be described as chaotic.

A cycle diversion is born

The one bit of good-ish news we can report is that we managed to convince the council to install a signed diversion route around the chaos. This would have been a first for Norfolk CC had they not taken so long to do it. Because of this a different cycle diversion gained the "first ever" award as you'll see later in this newsletter.

What they came up with is a diversion via Colegate, St Georges Street and St Andrews Hill which is of very little use and take riders into heavy traffic dumping them in the mayhem of Agricultural Hall Plain. It's a start, but really it just shows they have no idea how to deal with cycling.

Derek made a ride through video of the diversion. The badly placed signs (which were positioned as would be required for motor traffic) were moved after we complained. They are now slightly less confusing

Click the image below to watch the ride through video

Video ride through of Tombland cycle diversion

That's the good news, as far as it goes. The rest is far, far worse and really too much to go into here. To read the full critique of the project, take a look at the story on our website.

Suffice it to say the project - which is being promoted as improving access for cyclists (among other things) - is actually going to make cycling more dangerous, it's making the infamous cycle track in Tombland even more useless than it was before, it's making access to a safe pedalway route toward the station harder to get to and it's placing a serious obstacle in a the form of bus stops in a the very narrow and congest Upper King Street.

We have been making very strong representations to the council officers over the past month, explaining the problems (which it seems hadn't even occurred to them) and suggesting a partial solution. Sadly they have refused to make any changes on the ground as the project has been through the consultation phase and been approved.

In short the projected will:

* Make the Tombland cycle track pretty much useless by removing a safe cycle crossing of the busy road into Princes Street.
* Remove a section of the cycle track
* Remove the diagonal road across the square which provided  safe access to St Faiths Lane
* Create a shared use area where cyclists will have to weave around tourists and diners
* Add bus stops to the busy Upper King Street just before the point where the buses turn right to get into the bus lane to Castle Meadow

Please read the full account of the unfolding horror story.

St Stephens Street

St Stephens

Norfolk CC are proposing to make big changes on St Stephens Street to provide "saw tooth" bus bays. These would allow buses to park at an angle to the pavement.

In the view of the campaign this will make St Stephens even more dangerous for cycling than it is at the moment and so we are objecting to the whole idea.

The problem is that the buses leaving the bays have to swing out into the road and will not have a clear view of a cyclist coming from behind. So yet again we have a scheme proposed which is not only ignoring the needs of cyclists, but is actually making things more dangerous.

We have tried to find an alternative route for a cycle route, but really there isn't one, the nearest being via Brazengate and All Saints Green. That's a good route, but is a big detour for anyone heading into the city from Newmarket or Ipswich roads.

The situation is made more complex by the roundabout at the top of St Stephens. Although this is a deterrent to cycling, there are still many riders who choose to brave it. The lay of the land makes this a strong desire line, it is after all the ancient route into the city chosen because it was the best route for walking and horse drawn carts. The council are clearly expecting cyclists to continue to use the road because bike parking is included in the proposals.

The problem is Norwich doesn't have a functional bus station and in truth St Stephens is a totally unsuitable place for that function. This is the result of wasted opportunities and bad planning going back decades.

See the plans here and make comments - St Stephens and Surrey street area (NCC)

The campaigns response (Evening news 20th October)

Please object to this scheme, you can do that via the NCC web link above.

Blue Boar Lane

The plan

Much to our surprise Norfolk CC have suddenly announced a new scheme to provide cycle tracks along Blue Boar Lane in the far north east of the city. All we know about this is what we've been sent via the snail mail post, it hasn't been discussed with us at any of our meetings and doesn't seem to be online anywhere.

We haven't had a detailed look at it yet, but from first glance it looks worse than terrible, with several sections of short shared use pavement alternating from one side to the to the other of the busy road. They seem to be regarding these shared use paths as one way, which can never be the case for shared use - cyclists, like pedestrians, can go anywhere they like.

It should be highlighted that shared use pavements are toxic - pedestrians don't like cyclists on the pavement and cyclists don't like pedestrians getting in the way. They are pretty much useless for getting around at any decent speed.

The scheme is being funded by the developers of White House Farm housing development.

For more information about this scheme and how to make comments, e-mail Richard Austin Richard.austin@norfolk.gov.uk

And finally

Some good news - Marriott's way cycle diversion

Again though, this demonstrates the lack of understanding of cycling, indeed a reluctance to even consider cycling - by people in Norfolk CC.

Last month work started on repairing a bridge over the Wensum on the Marriott's way - a part of national route 1 of the Sustrans network - just past Lenwade which required closing the route. This is what cyclists  were presented with on arrival at the works

Marriotts way diversion

The pedestrian route was hopeless for cyclists, but the equestrian way was through lovely country lanes ideal for cycling. So why was horse riding considered worth signing when cycling wasn't?

Anyway, after the campaign complained to the relevant person at Norfolk CC, the signs were amended and this was, in fact, the first ever signed cycle diversion in Norfolk. It's worth noting the work was done in under 24 hours. But why wasn't it done right in the first place?

Marriotts way cycle diversion

Contacting us

The Norwich Cycling Campaign can be e-mailed here

Or by snailmail to
Norwich Cycling Campaign
21 Pembroke Road
Norwich
NR2 3HD

Campaign Website - norwichcyclingcampaign.org

Follow the campaign on Facebook facebook.com/NorwichCyclingCampaign/