Norwich Cycling Campaign

October 2021

October darkness

The clocks go back at the end of the month (31st October) bringing the delights of dark nights and the joys of winter.

It's really important to make yourself seen on the road at night, that's really just common sense. The Highway Code lays down some basic standards - a minimum of a bright red light (flashing or steady) and a red reflector at the back, a bright white light (flashing or steady) at the front and yellow reflectors on the pedals. Other reflectors and more lights are a good idea, such as those that fit in the wheel spokes and a white reflector at the front. A hi vis jacket with reflector strips is well worth considering. Do make sure nothing blocks the lights, like a long coat or something being carried on a rack and if the rear light is on one side of the bike, it should be the right-hand side, not the left.

Remember a lot of drivers aren't paying attention at the best of times, they're even worse when it's dark.

October of course brings membership renewal time again. We’ve really appreciated your support and contributions over the past year and we are nothing without our members.

We do like it when we can be positive in these newsletters and we do have some good news this month, but the disastrous changes around Grapes Hill roundabout dominate our cycling news. We also have a "nail house" about to cause problems on the Salhouse Road and a white-knuckle trip along perhaps the worst cycle route in the country, one aimed at family groups of tourists as well as commuters.

But we can round things off with some great news for cyclists from the government.

Norwich Science Festival

How gears work - all will be explained! Photo Derek

NCyC is supporting Norwich Science Festival, an excellent initiative with tons going on across multiple venues aimed mostly at getting youngsters interested in science. 

Come and see us at The Forum in Norwich on Tuesday 26th - Engineering day - and Friday 29th - Physics and space day - between 10.30 and 4.00pm.

We will be explaining some of the science which makes bikes work; why you don't fall off and how you can go up hills.

We’re particularly keen to show you our hands-on demonstrations of the gyroscopic effect of a spinning wheel and how gears work.

Entrance is free and it runs all day. Do come along, bring the family and say hi.

For a full listings of the many events during Science Week, see their website

Grapes Hill roundabout conflagration 

The narrow pinch point of the shared use pavement. The new toucan crossing will join here - Photo Derek

Most of the population of Norwich will be aware of the chaos currently being caused by the changes at the Grapes Hill roundabout in order to remove the traffic lights.

Norfolk County Council are doing this in an effort to improve traffic flow on the roundabout in the hope of shaving a few seconds off journey times for drivers. This is an outdated approach to urban planning which prioritises cars over the needs of walkers and cyclists.

The original plans which we reported here have been slightly modified without any further consultation but only represent a minor and partial improvement for cycling. 

The pavement along Convent Road - the short road connecting Unthank Road to the roundabout - is being converted to a shared use pavement.

The council seems to have accepted our point that the 3m path was just too narrow, so it's being widened at the Unthank Road end as well as the Chapelfield end.

Unfortunately, because they are determined to give space for three lanes of traffic approaching the roundabout, the shared use pavement still narrows to 3m in the middle section, just as it passes the new toucan crossing. This pinch point will cause conflicts on what is already a busy pedestrian route and is likely to become a very popular route into the city for cyclists.

Interestingly the outbound route from the roundabout to Unthank Road has been reduced to a single lane because of these changes to the shared use pavement. It remains to be seen what effect this will have on traffic trying to leave the roundabout.

NCyC has made strong representations to the council about this scheme, but all to no avail. Our betting is a lot of people are going to be unhappy about it.

We’ve been led to believe the government guidelines “Gear change” and “LTN 1/20” are designed to dictate standards of cycleway construction but these seem to have been ignored. The work is being funded by central government’s “Transforming Cities” fund, supposedly created to improve access by walking and cycling. It looks to us like funds earmarked to improve the active travel experience are being channelled into making life easier for motorists.

Convent Road and the roundabout were the product of 1960's urban planning, when the only priority was to provide room for traffic. It's a featureless traffic-dominated road running between the rear of the Hamlet Centre and the blank brick wall of Haas Automation UK. It replaced a vibrant network of streets with pubs and shops swept away in the late '60's when the ring road was built.  Pedestrians were given a drab pavement, but no thought whatsoever was given to cycling.

This reconstruction offered the chance to repair some of that damage and to return some of the space given over to traffic to people, instead it represents a real wasted opportunity.

A route not for the faint-hearted

Video: Crossing the A47 viaduct at Whitlingham, not for the faint-hearted - Ridden by Derek (Click the image to play video)

 

The A47 Norwich Southern Bypass was opened in the early 1990's to whizz traffic around the south of the city, a job it does well. It's a very fast, very busy road. It crosses the river Yare at Whitlingham and when the viaduct was built a shared use pavement was included along the western side. It's a classic example of a box-ticking exercise.

 

The problem is, this is a very desirable route connecting the beautiful countryside to the east of the city via Whitlingham Country Park to the city. The only other ways to cycle into the city are either the Yellow Pedalway - if you can find it - which goes over a significant hill or the busy and dangerous Yarmouth Road.

 

To get from the countryside cyclists have to navigate the maze of busy roads linking the A47 to the NDR. Cycle tracks do exist, albeit badly signed. The route over the bridge is served by these cycle tracks and is by far the easiest route to find.

 

Derek rode it in late August during the day when traffic levels were still fairly low. The path is narrow and when the video was taken was blocked by temporary road signs. As you'll see, it takes some courage to ride this totally inadequate route.

 

A lot of people do brave this route though, including family groups doing cycle tours and people commuting to either County Hall in one direction or the Broadland Business Park in the other. This includes riding at night, which really takes guts.

 

So, is this the worst cycle route in the country?

 

Youtube

Membership and AGM

A gentle reminder that your £10 annual sub is due.

Without members of course, the campaign is pretty much meaningless, so we encourage all our existing members to renew your annual membership now please. It still costs a mere £10 a year per person - no price increases here - equivalent to less than two pints in a pub.

Find details on how to pay below.

AGM urgent business

The AGM is planned for November (Tuesday 16th November) on Zoom and we'll send out a notice before then.

The main item on the agenda is the need for new blood. Covid has disrupted our plans to recruit new people and we are now in urgent need of new committee members from all age groups and backgrounds. 

Increases in Government funding and changes to legislation over the past 18 months have given cycling a major boost and there’s a lot going on, so there’s never been a better time to get involved.

You don’t need to be an expert in cycling infrastructure or Government rules. You just need to want to ride your bike more often, more directly and more safely around the city. We’re looking for ideas and help with publicity, events, getting together to ride socially, as well as finding ways to give more people, particularly female riders and youngsters, more confidence to get around on their bikes. If you want to help make some noise, now's your chance, there's room for you too!

So if you’d like to improve opportunities for cycling in and around Norwich we would dearly love to hear from you at the AGM. As little as an hour a week would give us a terrific lift.

Cromer and Aylsham Road works

Work is about to start on adding a city-bound bus lane to Cromer Road and Aylsham Road in the north of the city. Inbound cyclists will ride with the traffic through the works and there will be a 10 mph speed limit. Outbound however, while traffic is being diverted via the Wroxham Road, no provision is being made for cyclists on Cromer Road who are "advised to seek an alternative route".

Quite how Norfolk County Council expect cyclists to magic up some alternative route isn't clear. We are still in discussion about this, but it doesn't seem that any movement is possible.

Nail house on the Salhouse Road!

Riding the new Salhouse Road extension to the Pink Pedalway (click the image to watch the video)

Last month we mentioned a strange development on Salhouse Road, where a new cycle track suddenly gives up and becomes a totally unsuitable narrow foot path in order to get past a property and cyclists are greeted with a "cyclists dismount" sign.

This is an example of a "nail house", a private home whose owner refuses to move to clear the way for a new development.

We asked the council about this and they are aware of the issue and are still "seeking a solution"

The rest of the route though Harrison's Wood will be built as a 3m track all the way to Blue Boar Lane at some point, but there's no date for that yet.

 

So here is the video taken back in July, when traffic levels on Salhouse Road were very low. Normally this is a road you wouldn't want to cycle along due to fast, heavy traffic. If the plans come together this route will be part of a long-distance cycle track across the NDR to Wroxham.

 

The cycle track is now tidied up and appears to be fully open, but the narrowing caused by nail house remains as an unwelcome obstacle we must see removed. Can you imagine the outcry and speed of resolution if this were a road being blocked like this?

Youtube

And Finally

The government has completed its consultation on changes to the Highway Code and has mostly accepted the recommendations on hierarchy, meaning the most powerful vehicles have the greater responsibility.

 

They have made a few changes to the original proposals, but nothing too drastic. You can see the final response to the recent consultation here:  Government response to the review of The Highway Code

Facebook - Norwich Cycling Campaign

Twitter - @NorwichCycling

Membership

Just a reminder if you haven't renewed your membership yet please do so. It's a mere £10 a year. You can use the Paypal link on the website now https://www.norwichcyclingcampaign.org/join/ 

Or you can Bacs the payment to 

Payee - Norwich Cycling Campaign
Sort code - 089299
Account number - 65219661

_______________________________________

Contacting us

The Norwich Cycling Campaign can be contacted here

Or by snailmail to
Norwich Cycling Campaign
21 Pembroke Road
Norwich
NR2 3HD