Norwich Cycling Campaign

September Newsletter

September is with us and it looks like we're about to enter another period of restrictions thanks to the Covid 19 virus. Thankfully on a  bike you're in the open air, not in a confined space with lots of other people and of course you're getting exercise as you cruise past people sitting in traffic jams isolated in their cars. Cycling is a healthy and safe way to get around, but it's also enjoyable, fast, door to door and very cheap.

Winter is coming and with it the dark nights, rain and cold. But dealing with all that isn't difficult, it's just a matter of wearing the right clothes. A rain and windproof coat, pair of gloves and you're most of the way to being comfortable in all weathers.  Don't forget your lights, make sure your bike's got all the reflectors - red at the back, white at the front, yellow on the pedals - and wear a high vis jacket. Remember, there's no such thing as bad weather, it's all just bad clothes.

Next month is October, which of course is the time we will be asking for membership renewals, which is now £10 for the year. This is an important time for a campaign to improve cycling infrastructure, the government seems to have finally understood what needs to be done and has been making some encouraging noises. However at the same time the motoring lobby is stepping up its opposition to cycling, claiming cycle tracks are an attack on motorists. It's more vital than ever now that we present a professional and coherent argument for a proper cycle network of the type seen in Holland and other European countries. It's not just within built up areas either, good, safe cycle routes are needed between towns as well. This is going to be an important campaign and we need all the support we can get.

We are planning a recruitment drive, but of course given the virus we can't hold meetings or run stalls. We'll hopefully have more info about that soon. 

Finally we're planning a Zoom meeting to replace the AGM in November. We'll keep you posted.

Tombland

Tombland improvements - image Norfolk CC

Tombland Mayhem

Background

This has been the major issue faced by the campaign this month.

Tombland should be the architectural jewel in the crown of Norwich, instead it's polluted and traffic choked with one of the main arterial roads running diagonally across what should be a beautiful and architecturally valuable city square, it represents the biggest failure of traffic planning in the city and is nothing short of a disgrace which has been allowed to fester for decades. A scheme to improve the area is understandable and indeed long overdue.

To be fair, Tombland has always been a busy place. It was originally the beating heart of the city, the place where all the routes converged. 

The ancient streets of the city follow the desire lines of the pedestrians who created them, so they take the route all non-motorised traffic will naturally want to follow, which of course includes cyclists. So it shouldn't come as a surprise to find Tombland carries a lot of cycle traffic, indeed it's probably the busiest cycling route in the city proper.

Because of that, you might assume Tombland would have been seen as an important area to restrict or reduce traffic and to install proper cycling infrastructure, unfortunately you would be very wrong.

A lot of cycling grant money has been spent there, around £900,000 in fact, but that eye watering amount was spent making the area around Erpingham gate on the north half of Tombland look nice, justified by building a short section of cycle track that is of very little use to the vast majority of riders. This happened under the "push the pedalways" scheme with the creation of the Pink pedalway running from St Andrews Plain, past Erpingham gate and onto Palace street - an entirely new route which ignored the existing high level of cycling along that section. 

When the current scheme was announced it was billed as being done to improve walking and cycling in the area. However, this is simply untrue, there is nothing in the scheme to improve conditions for cycling and more than a little to actually make it worse, partly because it degrades the usefulness of the short section of Tombland cycle track even further. In addition a major part of the current scheme is to improve the flow of traffic through the area, which will only serve to increase the desirability of the route for drivers and therefore increase the amount of traffic 

During the consultation the cycling campaign did make representations, both to improve the design for cycling and to object to the measures which make it worse, but Norwich City Council who ran the consultation ignored all of our points. Now the responsibility for carrying out the work has transferred to Norfolk County Council which is undertaking the plan drawn up by the City Council.

The problems

The work actually started a month or so ago and huge issues have now come to light, issues which can be divided into two headings:

Problems for cyclists while the work is being undertaken 
and 
Problems for cyclists caused by scheme itself.

To their credit, Norfolk CC have been far more willing to discuss things with us than Norwich City Council were and as a result we've been able to raise issues with them over the past few weeks

Problems with the way the work is being carried out

There is a full run-down of the issues on the campaign website "Tombland again" which were apparent at the start of the works, please read that to get a full understanding of the issues.

Essentially the way cycling had been approached by the construction team was to simply ban it throughout the whole of Tombland, from Agricultural Hall Plain in the south right through to Wensum Street/ Palace Street in the north in both directions. Signs were put up telling riders to get off and push even though the area remained open to traffic northbound.

Get off and push

"Get off and push" sign at the southern end of Upper King Street - photo Derek

The campaign committee discussed what could be done about this and someone suggested we change the "get off and push" signs to "drivers get out and push" as a sort of non-violent form of direct action. Instead we mailed the construction team to suggest that if cars were allowed through, bikes should be also. We also included some virtual non-violent direct action in the form of a photshopped sign to make the point

Get out and push

Photoshopped sign by Derek

This was well received by the construction team and the 'get off an push' sign for northbound riders was removed the next day, so credit to Norfolk CC for that.

However, southbound was a different story. To be frank, it was chaos with cyclists trying to make their way through the works with absolutely no assistance other than to 'get off and push' signs. That simply isn't an option for riders of cargo bikes for example. In any case the northern half of the area has the Tombland cycle track to carry cyclists around the works.

In addition to the cycle track we identified two reasonable routes as detours for at least some cycle trips - St Faith's Lane (the Green pedalway) which leads off from the back of Tombland square and runs to near the station and Princess Street (promoted as Green and Pink pedalways and national route 1) which leaves from the north end of the works and fed into by the Tombland track.

Princess street has been blocked off by a works enclosure cutting those three advertised cycle routes without any consultation or thought given to a diversion, although it remains open for pedestrians. St Faiths lane remains open but is hidden and no cycling route or signage to it has been provided

Princess street closed

Princes Street is blocked off, cutting three advertised cycle routes - photo Derek

Derek and Richard B have had a (socially distanced) site meeting with the project team from Norfolk CC and were able to explain our concerns. The entrance to the Tombland cycle track does have a guided route onto it for cycles, but it's not very obvious and isn't signed. There seems to be some confusion within the construction tam as to whether temporary signing for cycling is allowed, it is and we were able to point them to the guidelines of how it should be done courtesy of Transport for London.

entrance to the cycle track

The entrance to the cycle track - photo Derek

The rest of the works area however is still covered by the "get off and push" instruction.

We made the following requests in writing:

During the construction phase cycle routes need to kept open where possible and we are pleased to note the changes made to keep at least some of the area open to riders.

We have identified the two diversion routes of Princes Street and St Faith’s Lane which would provide safe routes past the works. Those requiring Upper King Street should be properly accommodated, expecting riders of cargo bikes to dismount and use the pavement is not practical or reasonable.

We would refer you to the TFL information “Temporary Traffic Management Handbook” for guidance, page 40 onwards (http://content.tfl.gov.uk/temporary-traffic-management-handbook.pdf)

Problems with the plan

Far from making things better for cycling, the scheme make it worse for riders in several ways:

1: Removal of the light assisted crossing at Princes Street.

2: The plan to shorten the cycle track by approx. 10 meters

3: No off-road route across Tombland to St Faith's Lane and the cathedral

We have also expressed strong reservations about the section of Upper King Street where there will be two bus stops on the carriageway just before the point buses and cyclists have to move to the centre of the road at Agricultural Hall Palin.

We have made these requests in writing:

Removing the light assisted crossing at the junction of Princes St will only make crossing the road here more difficult for cyclists using the Pink & Green pedal-ways and national route 1. Because of this it largely negates the usefulness of the very expensive cycle route built in north Tombland outside the Erpingham Gate a few years ago. If a pedestrian crossing is required there, a cycle crossing is clearly also needed.

The current plans to remove about 10 meters of this previously installed cycle track are unacceptable and oppose our stated aim not to reduce any existing cycling Infrastructure. Doing this will further degrade the usefulness of the Tombland cycle track and again makes things worse for cycling.

We accept that the landscaping plan to remove the old toilet block, have outside seating and newly paved area by the restaurants will greatly enhance the public realm here.  However the lack of any signed cycling route between the north Tombland cycleway and St Faiths Lane (currently green pedalway) is bound to lead to pedestrian and cyclist conflict across the triangle.

We propose a two way route should be clearly signed and marked for permitted cycling just behind the trees and phone boxes near the new loading bay, allowing cyclists to ride from the Tombland cycle track and re-join the two way section of Queen street leading to the Ethelbert gate without having to use the main road. Through cyclists travelling north to south on Tombland to Upper king street can also use the main carriageway, but those with children or cargo bikes need a safer off-road link.  A shared use pavement next to the restaurant entrances is not a satisfactory solution here.

We acknowledge all this presents a big problem for Norfolk CC who regard the plan as fully decided, having been out to consultation in the normal way and are therefore very reluctant to change the design now. However, these are very real issues which cannot be ignored. They have promised a response in writing which we are still waiting for at time of writing this. 

Norwich western Link local access consultation

Plans are being drawn up as a part of the development plans for the "missing link" connection for the NDR across the Wensum valley at Ringland for dealing with local traffic in the area. The new road will cut several existing lanes, but also provide new routes for cycling, walking and horse riding. The campaign has given feedback to the consultation, which has now closed, and you can see it on our website here

Our position regarding the NDR extension is that we oppose it as being environmentally damaging and likely to increase car usage, but we accept there are huge commercial forces backing the project and so it's very likely to happen. Given that it's important that we work to ensure there is adequate provision for cycling to prevent the new road becoming a barrier to accessing the countryside.

Credit to Tony who has spent many hours researching the legislation covering the provision of cycling infrastructure around new road development and for compiling this feedback

Marriott's Way crossing saga

Last month we reported the plans to improve the Marriott's Way crossing of Hellesdon Road which involves a pedestrian/cycle crossing. Unfortunately the design for this has the cycle crossing offset from the mainline route

Marriott's way crossing

The proposed crossing of Hellesdon Road on Marriott's way  - image TfN

We have heard of two responses to this design objecting to the ridiculous detour cyclists are supposed to make. The reply to Derek said simply

Regarding your comments around the proposed crossing configuration, I can confirm I have now had a chance to discuss this further with our safety team and the guidance giving was that providing a slight stagger for cyclists is the safest option as this will hopefully slow cycle entry speeds to the crossing. It is also felt that it is more appropriate to divert cyclists slightly rather than pedestrians as they will have less distance to walk.

However, the reply to Roy also included another paragraph that said

However, I can confirm the crossing location and configuration will be looked at in more detail through the detailed design stage and if visibility standards are met we may have an opportunity to move the crossing southwards slightly so that as you suggest the middle of the crossing is in line with the path.

So maybe, we'll have to see, but the phrase "if visibility standards are met" seems strange when the proposal is only to move the crossing perhaps 2 meters or so. Both e-mails were sent at the same time from the same person.

The present proposal is clearly unworkable, few cyclists will make the dog-leg detour to ride over the cycle half of the crossing, most will simply ride across the pedestrian half.  It frankly beggars belief that such an obvious design error could be made and that anyone at Transport for Norwich would think it's a good idea.

 

And finally

St Faith's Lane, Norwich's amazing forgotten street.

Many people are unaware of the St Faith's Lane route from Tombland to Prince of Wales Road, despite it being shown on the city cycling map as the Green pedalway. It starts right by the Ethelbert gate into the cathedral close, but you won't see it unless you look carefully. You enter the route through an arch in the buildings and if you don't know it's there you've maybe never noticed it.

St Faith's lane is actually a very old road, one of the original roads of Norwich. It follows the boundary of the cathedral close with a series of sharp bends. It's closed to traffic for much of its length and the remainder is very quiet, ideal for cycling.

In fact the route continues across Prince of Wales Road and Rose lane and is now known as Mountergate, which you can follow round to King Street.

It is possible to ride through the cathedral close and to join St Faith's lane further down, but beware the "tank trap" traffic calming trenches (not humps!) in the close.

Ride through video by Derek

St Faith's Lane ride trhough

Contacting us

The Norwich Cycling Campaign can be e-mailed here

Or by snailmail to
Norwich Cycling Campaign
21 Pembroke Road
Norwich
NR2 3HD

Campaign Website - norwichcyclingcampaign.org

Follow the campaign on Facebook facebook.com/NorwichCyclingCampaign/