Please comment on this scheme! You have until Monday August 26th. We summarise the issues below and suggest the best way to respond to the consultation.
You can access the consultation online here.
For a deeper explanation of the issues, see our blog: Proposed cycle route along the A140 Holt Road
Summary
The extension to the Yellow Pedalway from the airport to the NDR junction is a long-promised scheme that we very strongly support, but what is proposed is far below an acceptable standard and fails to pay lip service to the current design standards.
The route has enormous potential to provide an active travel option to car use along one of the major roads into the city from villages north of the NDR, it would also do the same for The Nest sports centre located just south of the NDR junction. To do this however, it must be viable, it must be a route that people would feel safe using. What’s proposed falls well short of the minimum we have a right to expect.
The map below highlights some of the worst problems:

Headline issues
- It fails to provide a continuous, safe and direct extension to the Yellow Pedalway out to Horsford (its primary purpose).
- It fails to provide a continuous, safe and direct route to The Nest/Manor Park (its secondary purpose).
- It fails to comply with the national design standards for cycling infrastructure (LTN 1/20).
- The side road crossings are dangerous and badly designed. They should instead be cycle priority crossings, providing a continuous cycleway and footway.
- It is not safe to have an uncontrolled crossing of Holt Road (near The Nest).
- There is no buffer between the cycle track and the road. This is a 40mph road and riding close to the road will feel very unsafe, especially on the unlit northern section after dark.
- The two bus stops that adjoin the cycle track are poorly designed (with no proper cycle bypasses) and will create conflict between cyclists and bus users. The bus stops are “accessible” so will presumably have a raised section of pavement next to the road. If this is in the space designated as the cycle track this will present an additional hazard for cyclists.
- There are a large number of cabinets and a phone mast blocking the route near where the inbound bus stop by the park & ride is located. The cycle track needs to “bypass” these but there is no mention of how this issue will be resolved.
- Toucan crossings should not be used on new schemes. Any crossings should instead be parallel light-controlled parallel crossings (with separate crossings for cyclists and pedestrians).
- The path should not be shared-use (meaning cyclists have to mix with pedestrians). To be a viable long-distance commuter route there should be separate paths for cyclists and pedestrians.
- By leaving a gap in the route between Amsterdam Way and Liberator Road it fails to provide a continuous extension of the Yellow Pedalway.
- There is no cycle access to the route from the Middletons Lane/Amsterdam Way junction.
- There is no inbound bus stop near The Nest so how will anyone taking the bus there return home?
How to respond to the consultation
There are a few specific questions and then you have the opportunity to make general comments. It’s best to use your own words, but you can incorporate our suggested comments.
Page 1: What’s being proposed and why
The description is a very broad outline of the proposals.
You are then asked if you agree with the aims of providing “an extension of the path for people walking, wheeling (using wheelchairs or pushchairs) and cycling between Amsterdam Way and the A140 Holt Road roundabout with the Broadland Northway”.
Answer: “Like it very much”
You are asked why: This is a much-needed cycle route for commuting from the villages north of the NDR and for reaching The Nest sports club. However, what is designed is totally inadequate, not viable and is dangerous.
It’s important that you make the point that the proposed design is inadequate and unsafe and needs to be revisited.
Page 2: Proposal 1
If you click to view the plans you will see three maps of the route. These maps show the proposed changes. You can use them in conjunction with our map of some of the issues above.
You are then asked to what extent do you like or dislike “the new shared-use path on A140 Holt Road, between Amsterdam Way and the roundabout with the Broadland Northway (A1270)?”
Answer: “Strongly dislike it”
You are asked why: Shared-use paths are dangerous, slow and disliked by both pedestrians and cyclists. A shared-use path is not viable as a commuter route. There should instead be separate paths for cyclists and pedestrians.
Page 3: Proposal 2
This asks about the Toucan crossing. You are asked if you like or dislike “the new Toucan (signal-controlled) crossing on Holt Road opposite Hellesdon Allotments”.
Answer: “Strongly dislike it”
You are asked why: The route should be direct and not change sides halfway along, it makes the route slow and uninviting. You can also make the point that the “informal” crossing at the NDR roundabout is dangerous and unacceptable, especially so at night when it will be unlit.
Page 4: Proposal 3
This asks about the bus stops. You are asked if you like or dislike them: “New bus stops (accessible, with tactile paving – two outbound from the city and one inbound to the city).”
Answer: “Strongly dislike them”
You are asked why: The bus stops will block the cycle route causing conflict between cyclists and people waiting for the buses. There should be bus stop “bypasses” to separate cyclists from people at the bus stops.
Page 5: Proposal 4
This is about the proposed 40mph speed limit along all of Holt Road (reduced from 60mph).
Answer: “Strongly like it”
Cycleways and footways should not be built along roads with speed limits above 40mph. The lower speed limit will make the route safer for everyone.
Page 5: Summary
This is space to write your own comments. You are allowed 1000 words, please use your own words but include the observations made above in the bullet points. Please stress that this scheme is unfit for purpose and needs to go back to the drawing board.
Remember, you have until Monday August 26th!
You can access the consultation online here.