Colney Lane – “safety audit” fails to address dangers of new junction

With the works on the Colney Lane roundabout now complete, a final safety audit has been performed. Peter Silburn looks at what this uncovered (and what it failed to cover)

We’ve been highlighting the dangers of the Colney Lane roundabout scheme since we first became aware of what was being proposed. Our video of the scheme has been described as “an 8-minute masterclass on all that is wrong about UK roundabout design”.

We have now obtained a copy of the safety audit, known as the “Stage 3” audit which takes place after the scheme has been largely completed. It does not address the dangers to cyclists resulting from the changes to the junction.

Dangerous for drivers

The focus of the audit is almost entirely on the dangers for motorised users of the junction.

One of the issues raised is that on the eastern approach, where the road has been widened from one lane to three lanes there is a danger of “sideswipe collisions” as drivers work out which lane they should be using.

Three traffic lanes where there was one – Photo Peter

The suggested solution is for a big sign (more suitable for a major trunk road junction) on the approach, warning drivers to get into the correct lane. The proposed location for the sign is next to the already very narrow cycle path. It is not clear whether there is physically room for such a sign and whether it will block visibility for users of the path.

People on bikes will also be using the roundabout. There is no mention in the safety audit of the increased danger to cyclists of drivers not knowing what lane they should be in. If the redesign of the roundabout has introduced risks to users of the junction, perhaps part of the solution might be to reduce the speed limit?

Shared-use signage

The audit does identify a lack of signage for the shared-use paths on the southern and western arms of the junction.

This is interesting since the original plans showed these paths as being pedestrian only. Only after we raised this were we told that the design would be amended to allow cycling on the southern route (as we were assured in our earlier discussions). Cycling on the new western path now also appears to be allowed.

New shared-use path on the western arm – Photo Peter

Whilst we welcome the clarification, these paths remain dangerous and wholly inadequate for their intended purpose on such a busy junction for cyclists and pedestrians. They do not comply with the national design standards and also ignore the recommendations of the earlier Stage 2 Safety Audit.

Danger to cycling ignored

It is astonishing that a safety audit for a scheme that promises “enhanced cycling and walking” facilities makes no mention of the new dangerous crossing points, of the danger introduced by locating the bus stops next to the crossing, the highly risky “desire line” crossing or the dangerously narrow paths.

The sole reference to any issues for people on bikes is in the Appendix, which is for comments only and where “the issues noted are not necessarily safety issues” and are “outside the scope of the audited scheme”.

Cyclist on the narrow path – Photo Peter

Nevertheless it is recorded that a complaint had been received from a member of staff at the hospital about the removal of the original crossing point closer to the junction. In reality we know that there have been dozens of complaints raised by hospital staff about the changes to the junction.

The designer’s response is that the loss of the direct route through the junction has been more than compensated for by the new Toucan crossing on the northern arm and the new shared-use facilities on the western arm.

Both the new route around the north of the junction and the amended (and now longer) southern route are dangerous and highly inconvenient. To say that “there are now cycling facilities around more of the roundabout than was previously the case.” pushes the irony meter off the scale.

Our video was picked up in the media

What is CD143?

One of the critical issues with the junction is the narrow width of the shared-use path around the junction. It is only 2m wide in places, which is wholly inadequate as well as being dangerous.

The Stage 2 Safety Audit (undertaken before the works were completed) stated that a 2m wide path “could lead to conflict between cycles and pedestrians at busy times” and recommended the path be widened to 3m. This was ignored, and the Stage 3 Safety Audit is now saying that 2m is fine and quotes a document called “CD143 Designing for walking, cycling and horse-riding”.

This is not a document we have come across before, which is not surprising since it is supposed to only be applicable to “facilities on and/or adjacent to the motorway and all-purpose trunk road network”, which the Colney Lane roundabout clearly is not. We have been told that this document only has formal status on National Highways roads.

Local authorities can however choose whichever guidance they wish to follow, but it is a curious choice over LTN 1/20, which is the national design guidance for cycle infrastructure, and is referenced in Norfolk County Council’s own cycling strategy document.

Did someone say cherry picking?

CD143 never came up in any of our discussions with Norfolk County Council about the junction prior to this. It smacks of cherry picking a document which justifies your design choices after the event.

If you are going to choose a document you should at least be consistent within that document. However it seems they have not only cherry picked which document to comply with but also which parts of the document they choose to follow.

Section E/3.5 of CD143 does indeed state that “widths of unsegregated shared use routes shall be a minimum of 2.0 metres where there are less than 200 users per hour.”

But there are other sections where compliance is less certain.

For example, section E/3.2.1 states that bends on shared-use paths should be curved and not at sharp angles. The sharp turn on the route from the hospital onto the western arm is a textbook example of this. Being on a steep slope, when the path is wet or icy there is a high risk of cyclists losing grip and sliding into the road. The safety audit makes no mention of this.

Section E/3.5.1 says there must be a 0.5m buffer between the path and the road. There is no such buffer on the path, with a risk of both pedestrians and cyclists falling into the road (which is now more dangerous due to the recent changes that allow more and faster traffic).

Section E/5.2 says that clear visibility (from up to 4m back) must be provided at crossings. Arguably locating the new crossing point next to a bus stop (providing zero visibility when there is a stationary bus there) fails to comply with this.

In any case, why is it considered acceptable to merely comply with the minimum?

Shouldn’t Norfolk County Council be aiming for something better than the absolute minimum standards when designing infrastructure for people on bikes? You would never design a motorway or an airport like this.

______________________________________________________________

Keep up to date with the campaign by subscribing to our free monthly newsletter.