Peter Silburn concludes his cycle ride around the NDR and offers some suggestions for how it could be improved
In Part 1 of my journey I rode the cycle path alongside the NDR from near Taverham to Horsham St Faith. We pick up the route in Horsham St Faith on the first of the detours from the NDR and ride all the way round to the Postwick Park & Ride.

Horsham St Faith to New Rackheath
We left the route having turned north into Old Norwich Road. At the end of the road turn right into Spixworth Road and then immediately right again into Bullock Hill, now closed to traffic and which takes us back to the NDR. At the end of the road join the cycle track that leads us to the Petans roundabout north of the airport.
At a junction on the cycle track just before the roundabout we have a choice. We can carry straight on, taking a slightly longer route (signposted to Spixworth and Postwick) which follows a quiet country lane to the north of the NDR and that avoids having to cross it.
However, we’ll turn right here (signposted to Petans) and continue on the off-road cycle track along the south of the NDR. This does involve an uncontrolled crossing of the NDR (the only one on this route).
Take great care crossing the road. You basically have to wait until there’s a gap in the traffic, nobody is going to stop to let you cross. A bridge needs to be built at this crossing.

Once across the NDR we then cross Imperial Way (the access road to the Petans training facility) and follow the cycle track around the northern perimeter of the airport where we have fine views of the parked-up planes.

As we approach the bridge that takes Buxton Road over the NDR continue on the track under the bridge and follow the path as it arcs round to the right and up an incline to join Buxton Road. Shortly after joining the cycle track on Buxton Road turn left into Beeston Lane (signposted to Rackheath and Postwick). We now take the second detour on our route.

For approximately two miles we follow Beeston Lane, a quiet country lane, which makes a pleasing contrast to the path along the NDR but unfortunately at the halfway point we need to cross North Walsham Road, a fast and busy road. Due to poor sightlines in both directions when crossing from west to east, extreme care is needed. This is unacceptable for a signed cycle route.
Once safely across we continue on Beeston Lane passing the picturesque Beeston Hall on our left. When the road makes a sharp right turn we carry straight on through a gate to take a winding concrete farm track back up to the NDR. We continue on the cycle path down to the roundabout on Wroxham Road.

Cross over Wroxham Road and continue on the cycle track until we come to a bridge over the NDR. The path does continue as far as the next roundabout on Salhouse Road but instead we turn left here for our third and final detour taking the bridge (Newman Road) over the NDR to avoid having to cross it at the roundabout. At the end of Newman Road turn right into Green Lane West. We’ve reached New Rackheath.

New Rackheath to the Postwick Park & Ride
At the mini roundabout by the Sole and Heel pub go straight across into Green Lane East. Cross over the railway at the level crossing into Broad Lane. At the end of Broad Lane cross over Norwich Road and join the cycle track on the opposite side of the road, which heads south back towards the NDR.
For the next three miles or so the path follows the eastern side of the NDR. We cross Middle Lane where if we were to turn right the road takes us via a route on the cycle paths of Dussindale to Thorpe St Andrew and the Green Pedalway.
There is also a signed route to the Broadland Business Park which takes a path on the western side of the NDR but this involves either a muddy bridleway or a busy 60mph road with no cycle lanes.

Instead we continue straight ahead on the path to the eastern side of the NDR and eventually we reach the end of the route just north of the Postwick Park & Ride. If you’ve ever driven through the Postwick junction you’ll know how disorientating it is. At least on a bike you can stop to have a look around and work out where you are. The distinctive buildings being constructed like the new electric vehicle charging station help you locate which bit of multi-lane highway you’ve just crossed.

Having crossed the slip road to the A47 (take extra care here) we actually have to head off in the direction of Great Yarmouth for about 300 yards, join the traffic on a roundabout to turn back on ourselves, join the entrance to the Park & Ride (currently closed) and then after crossing up to ten (!) roads we get to the start of the Green Pedalway in the Broadland Business Park.
The official signed route takes an even longer way down Oaks Lane and along an admittedly rather pleasant off-road cycle track across fields but the route I’ve described above through the Park & Ride is more direct.
There desperately needs to be a bridge here to provide a link to the business parks. From where the cycle track crosses Smee Lane to the Broadland Business Park is just under 3 miles of contorted route (shown in orange on the map below). The direct route – either via a bridge at Smee Lane or near the electric vehicle charging station (both indicated in red) – would be just over one mile.

Also, not a fault of the NDR route perhaps but there is no cycle route from the end of the cycle track at Postwick into the city centre along Yarmouth Road, which is the most direct route. There is a short section of track but it unceremoniously stops at Boundary Lane.
Instead, you have to make your way to the Green Pedalway which is an indirect route and involves climbing up onto the Thorpe St Andrew ridge and then down again as you approach the city.
What’s wrong with the route and how can it be improved?
What’s wrong with the NDR cycle route can be summed up as:
- There’s no protection at the junctions
- It’s not continuous
- It doesn’t connect up with the places people want to go to
No real money has been spent on cycle infrastructure. Where are the new bridges and underpasses? Where are the fully protected cycle crossings at roundabouts? Where are the connecting links to the villages?
Near the Reepham Road roundabout there’s a substantial bridge over the NDR built for a farm track. Surely a bridge or two could also have been built to enable people on bikes to cross in safety?

The cycle tracks are not built to the currently applicable design standards for cycle infrastructure (LTN 1/20) which came out in 2020, two years after the NDR was built. However, any changes to the road will need to comply with these standards.
LTN 1/20 has a set of design principles which all transport schemes must adhere to. Those principles most relevant to the NDR are:
- On roads with high volumes of motor traffic cyclists must have physical protection, both at junctions and on the stretches of road between them (Principle 3)
- Routes must join together to create a holistic, connected network (Principle 8)
- Schemes must be legible and understandable, and must be clearly and comprehensibly signposted and labelled (Principles 10 & 11)
- Schemes must provide direct, logical routes that are easy and comfortable to ride (Principles 18 & 19)
- Surfaces must be hard, smooth, level, durable, permeable and safe in all weathers (Principle 14)
- Barriers and dismount signs should not be used (Principle 16)
- Once routes are built they must be maintained properly afterwards (Principle 13)
From west to east here are some of my suggestions for how to make the cycle route safer and more attractive:
- Build a cycle path on Fir Covert Road between the NDR and the Taverham nursery. There is space on the western side of the road. This could be extended further to connect up with the new section of cycle path next to the Lidl store.
- Improve the surface of the Marriott’s Way between Drayton and the NDR so it can be used all year round in all weathers. The section between the old Hellesdon station and Drayton was recently upgraded. The section north of Drayton needs to be brought up to a similar standard.
- Improve the surface of the path through the Drayton Drewary Open Access Area so it can be accessible all year round and in all weathers.
- Build a cycle path on Holt Road between Crown Hill and the Brewery Lane roundabout.
- Provide a safe crossing at the Cromer Road roundabout – a bridge, an underpass or a light-controlled crossing.
- At the Petans roundabout north of the airport near Bullock Hill provide a bridge over the NDR. If the bridge crossed diagonally it could link up the end of Bullock Hill directly with the path on the eastern side of the NDR.
- Where the detour along Beeston Lane crosses North Walsham Road install a light-controlled crossing.
- Build a bridge at the eastern end of the NDR to provide a link into the business parks. This could either be at Smee Lane (which was severed by the NDR) or further south near the electric vehicle charging station. A bridge could link up with the new roads and cycle paths that are being built at the moment so it’s not too late to rectify this mistake. A bridge by the electric vehicle charging station would link up with the new cycle path on Maple Way and provide a direct link to the business parks and onwards.
- The route passes close to the villages of Taverham, Rackheath and the Plumsteads but doesn’t provide connections to them. Providing an attractive cycle route would enable more people in these villages to choose cycling rather than driving.
The cycle path alongside the NDR was provided in the space left over from building the road, and where it was a bit more difficult they didn’t bother. Where the NDR severs arterial roads they provided cycle tracks around the roundabouts, one suspects more to keep cyclists off the roundabouts than to provide useful cycle routes.
It can therefore be regarded as an “opportunistic” cycle route, only there because of the NDR. Not how you should go about building a cycle network but, as the saying goes, we are where we are.
With all the new housing being built or planned near the eastern section of the NDR if we don’t provide a high quality network of cycle routes we are baking in yet more car dependent households whose transport choices will be harder to shift in the future.
If the problems outlined here were resolved the cycle route could become a useful addition to the Norwich cycle network that would enable more people in the villages north of Norwich to enjoy the benefits of getting about by bike as well as providing an attractive circular route accessible from the city.
All photos by Peter Silburn
__________________________________________
Keep up to date with the campaign by subscribing to our free monthly newsletter.






Having cycled the route in the middle of summer, you won’t have had the opportunity to see both parts of Beeston Lane after prolonged rainfall – the road floods on the first half, in the dip and also on the top half, at the sharp bend before the gate on to the path.
Wroxham Road crossing can also be extremely dangerous – although there is a refuge in the middle of the road, traffic is coming off the roundabout, at 60/70mph – quite often without signalling and from any of the lanes!