While going through some old VHS tapes in October 2022 Derek came across a long-forgotten video labelled “Wensum valley demo 1st September 1991”. It was a video taken of a demonstration to oppose the building of a major dual carriageway road along the Wensum valley route, what we now know as the Marriott’s Way
After editing the rough shots the video project was finally completed after 31 years.
A dip into our archives helps tell the story of how Norwich was saved from the widespread destruction the road building would have caused. It also showed the actual date of the demo was 22nd September.
The background
To understand what was going on we need to go back to 1963 and the publication of a report for the Ministry of Transport called “Traffic in Towns” by Colin Buchanan, also known as “The Buchanan report” (Wikipedia). We had to learn to live with the motor car and this was the way it would be done.
Back then traffic had become a serious problem for the old city and was predicted to get a lot worse as ever more people bought motor cars, so the creation of a “ring and loop” system for the city centre was proposed.
The idea was quite simple, traffic would be sent round an inner ring road and only allowed into the old city on loop roads, which went into the centre and back out again, closing off the city centre to through traffic.


So in the 1960s and early 70s work got underway bulldozing the inner ring road dual carriageway around the old city, wiping away residential streets like Chapelfield Road and Grapes Hill and destroying a large area of the ancient city around Magdalen Street, disfiguring what was left with the dreadful flyover. This was seen as the “progress” needed to make room for the car.
But that was as far as the project got with the dualling of Chapelfield Road being the last bit of the plan being completed in 1973. The areas around Barrack Street and Queens Road were left blighted for years as the plan seemed to run into the sands.
Although Queens Road was widened in the early 80s, it was uncertain if it would form a part of the completed project. Nothing happened for the rest of the 80s until the whole thing was resurrected by the County Council who decided to complete the project around the turn of the decade.
Completing the inner ring road
During 1990 the debate raged about which route should be taken to complete the inner ring road. There would also be two new radial routes to bring traffic in from the outer ring road, one following the old railway line we now know as the Lakenham Way and the other following the old line along the Wensum valley now known as the Marriott’s Way.
There was, of course, no debate over whether all this was actually a good idea. At the time the plans were simply presented as ways to finish the job and were considered essential by the County Council.

The plans were truly massive. The inner ring wouldn’t follow Queens Road but would instead follow the line of the then new Norwich Union offices on the corner of All Saints Green and Queens Road, dive under Ber Street in a tunnel, then turn right along the line of Rouen Road and then over a massive cable-stayed bridge crossing the river and railway. From there it cut a swathe through Rosary Road and Riverside, then along Barrack Street to the end of the flyover. The devastation this would have caused created an unexpected backlash, the traffic plans had never faced opposition like this before. Our first newsletter in 1990 reported on the plans.

Opposition groups of all sorts – from environmental campaigns to local schools – came together under the banner of the “Norwich Road Action Group” – Norwich RAG.
The Wensum valley radial route
While all this was going on there were also the plans for the radial routes. The one along the Wensum valley was the biggest. It had always been a part of the traffic plans, which is why the Barn Road roundabout was built ready to accept the traffic. All the way through the 70s that roundabout was “pointless”, with just one way in and one way out. Barker Street was added to the roundabout in the early 80s but was not a part of the long-term plan.
It should be mentioned the valley was a very different place in the 1970s to the place we know today, the whole area had been covered in railway sidings and was a scene of industrial dereliction and that was how most people thought of the place, it really wasn’t somewhere you would have wanted to go to. Building a road through it was pretty much uncontroversial.
The railway tracks to the old City station which used to stand where the roundabout is had been lifted for some time, the rest went late in 1973 or early 1974 and the route of the Midland & Great Northern line was thought of as wasteland left to slowly return to nature. By the end of the 1980s the old railway shunting yard by the river had become a young woodland and the old track bed an unofficial footpath. Sometime in the 80s Norfolk County Council bowed to public pressure and laid a gravel path from the roundabout to Anderson’s Meadow and out toward Sweet Briar Road and Hellesdon Road. This included a fairly narrow wooden bridge over the river where the Dragon bridge is now and slowly, people got used to having it.
At the time it was made clear this could not be permanent as the valley was a protected route for the new road which, we were told, was urgently needed. But throughout the rest of the 80s the footpath/cycle route became ever more popular, and the young woodland became more established. Around 1990 the plans were announced to complete the ring road project and this temporary footpath cycle route would have to go.

The plan would have devasted the valley. The road was to be dual carriageway, something like 15 metres wide plus borders. It would have taken out the woodland between Barker Strret and the river, destroyed Anderson’s Meadow and much of the Sweet Briar marshes out as far as Sweet Briar Road. There would have been a large roundabout junction at the embankment level of the outer ring road.
No more roads!
This became something of a cause for Norwich RAG, including the newly formed cycling campaign. It was especially motivating for the campaign which saw the potential of a traffic-free cycle route all the way out to Drayton and the then new Thorpe Marriott estate.
So it was that a big demo was organised to rally opposition to the road building plans. Local politicians were onboard, both MPs and city councillors.
Our newsletter at the time – in fact only the second edition of the newsletter – reported the upcoming demo.

And so it was that on a baking hot Sunday in late September a large group of Norwich citizens turned up at the appointed time to walk and cycle along the old railway route, for many it would have been the first time they saw this wonderful place which had for many years been an industrial wasteland but now brought a slice of countryside right to the edge of the old city and it proved to be a real eye opener.
From here the campaign against the road plans grew and other events followed, including a mini festival on Anderson’s Meadow the following year. The result was that a plan that had existed for almost 30 years and was almost certain to go ahead was abandoned, not just the radial routes but the whole destructive inner ring road proposals.
Although the County Council has never liked to admit it, that was a watershed moment, the Buchanan report of 1963 was finally put to bed and that should have been the end of it. But despite this failure to build the ring and loop system, the council pressed on as if nothing had changed and now – 60 years after the Buchanan report, Norwich is still trying to make an outdated and half-completed transport plan work, a plan drawn up in a different age. Even had it been built, the network would have been swamped by the volume of today’s traffic.
But because of this we still have the Wensum valley, the young woodland is now known as “Train Wood” and the path is a part of Sustrans NCN 1 route, otherwise known as the Red Pedalway but more commonly as the Marriott’s Way. It provides a 26 mile walking and cycling route all the way to Aylsham and is becoming a major commuting route for cycling into the city. It’s important to remember though, we nearly lost it to acres of tarmac, exhaust fumes and the roar of traffic.
Matthew Williams, founder member of the cycling campaign, remembers
Watching that evocative film of the Save the Wensum Valley walk that took place in September 1991 makes me realise how much things have changed in the last 31 years (not least the style of men’s shorts!), yet also how strangely similar some of the issues are to today.
There are obvious close parallels between the campaign to stop a major road being built across the River Wensum at the Norwich end and the present controversy about the County Council’s proposed Western Link across the Wensum Valley – both threatening massive and unnecessary destruction of existing habitats and landscape.
We should perhaps draw encouragement from the film’s closing captions reminding us that the original campaign was indeed won: the County’s proposed dual carriageway linking Sweet Briar Road with Barn Road was never built. Councillor Andy Paine’s homily captured on the video soundtrack about air pollution and “emissions from catalytic converters” is not a million miles away from our present recognition of the crisis in both local air quality and global atmospheric carbon dioxide.
As joint founder of Norwich Cycling Campaign in 1990 with the legendary Les Hopkins, I had previously become involved in cycle advocacy through the CTC (now Cycling UK). The dynamism of the campaign in those early days lay in the coming together of activists from the cycling world and local environmental campaigners, notably Friends of the Earth, with a focus on persuading local decision-makers that cycling was neither a nuisance nor the behaviour of people to be pitied, but in fact the solution to many of our traffic woes and the potential core of a modern urban transport system.
I don’t recall having personally attended the particular event shown in the video, which took place just as we were getting the Cycling Campaign going, but a browse through the early editions of the Campaign newsletter (available here) shows that we were closely involved, being represented on the Save the Wensum Valley organising committee behind the event – which had been triggered by the County Council’s decision to include the “M&GN Radial Road” in their Norwich Area Transport Strategy.
When you read some of the grossly pro-car quotes from county councillors of the time (who included Jonathan Peel mentioned near the start of the video), you begin to realise the scale of the damage being wrought on Norwich by these attitudes since the County came into existence in 1974. It is interesting to note that they had actually commissioned a report from Sustrans in the 1980s on opportunities for cycling, but unsurprisingly didn’t like the recommendations, and a decision was evidently made to keep that report under wraps.
The tide turned for them when their suppression of the document embarrassingly came out during the 1992-3 public inquiry into their inner ring road project in which both Norwich Cycling Campaign and Friends of the Earth were key witnesses. Their mad plan to build an urban motorway on a viaduct over King Street on the south-east side of the city was duly rejected by the inspector, and the shock to the County Council must have influenced their subsequent decision to drop the M&GN Radial Road proposal.
Significantly, the County also went on to appoint a mould-breaking cycling officer at this time, by the name of Robert Marshall. Before long, it became clear that he didn’t mind making himself unpopular with colleagues and was prepared to bang heads together to do something more than tokenistic to promote the use of bicycles. It was he to managed to constitute a joint committee (with members delegated from a number of bodies) with a view to significantly upgrading the rough path up the old railway route into a proper cycle path – including the replacement of the timber footbridge you see in the film.

For several years from the mid 1990s I sat on that Drayton Path (later Marriott’s Way) Project Board as the only unpaid person in the room, and for many months witnessed endless arguments and planning, and not a lot of action. I think I was probably representing Sustrans rather than the Cycling Campaign, being involved in route-planning for them in connection with NCN Route 1. It was illuminating to share in tortuous discussions between differing local authorities about path materials, mowing regimes and even artworks – before we even got to consider the design of a new bridge (the appointed artist was heavily involved in that).

But there was a budget, and eventually a multifarious project ground into action, with path reconstruction starting in November 1997. I remember that the almost-as-tricky Lakenham Way Cyclepath on the other side of the city centre (another of the County’s intended road links) was conceived, implemented and opened by the City Council within the lifetime of the Marriott’s Way project, but that’s another story.
Back at the Wensum valley, after a late realisation that there was no road access to the site, the new river bridge which had been delivered from Kent was lowered into place in February 2000, after removal of many trees to provide crane access. The resurfaced path was finally completed a year later.
Twenty years further on, the Marriott’s Way has more than proved itself, but it seems the arguments against road-building have just moved further out of town.
Matt Williams
01.11.22
You can see our archive of newsletters which go all the way back to 1990 here.
_________________________________________
Keep up to date with the campaign by subscribing to our free monthly newsletter.