The project to provide a walking and cycling route across the A47 Longwater junction and the adjacent William Frost Way finally took what promised to be a leap forward at the end of July this year, when work started on building the toucan crossing over William Frost Way, just 11 years after first being proposed. Derek Williams explains what happened next

The plan
It’s fair to describe the design as underwhelming, but this crossing on William Frost Way is essential, not only for the proposed cycle route over the A47, but also for the large numbers of bus passengers shopping at Aldi or any of the other shops in the area who have had to take their lives in their hands getting across the road for decades.
The scheme included extending the existing shared-use cycle route (shown in black on the drawing above) down the hill to Aldi (shown in red) and building a new light-controlled toucan crossing. The crossing was to be two stage – which means two crossings, one on each side of the dual carriageway with a waiting area in the central reservation. This is less than ideal and could make getting over the road a very slow process if the lights take a long time to change, given you’ll have to wait for two sets of lights.
The crossing is also located half way down the hill, meaning anyone walking or cycling towards the A47 junction from the city will have to take a long detour to cross, and will also need to get across both the Next and Sainsbury’s car park entrances – both very busy, dangerous junctions. But this was designed to cause the least disruption to car traffic and, as usual, that was the most important consideration for the planners. Oh, and it was the cheapest option.
All the traffic entering and leaving the area – which includes the shops, an industrial estate and the huge housing estate of Queens Hills – has to travel the full length of this road in both directions, and it’s the only route available. William Frost Way is operating at capacity and at peak times any delay causes traffic queues to quickly build up.
Work starts, problems surface
The works required re-aligning the kerbs so as to create more space on the central reservation for people using the crossing. This involved closing one of the traffic lanes – which caused total gridlock, confining people to their cars for several hours and making it impossible to get out of Queens Hills by car. The roadworks were cancelled on the second day so all work stopped.
Work resumes
After a couple of weeks a new plan was drawn up which got the job done very quickly (no doubt at great expense) with a temporary exit for Queens Hills residents provided by opening the never-used bus road toward Taverham – yes, there is a never-used bus road, but that’s another story of muddled plans.

During the first phase of the work on the southbound carriageway absolutely no provision was made for pedestrians or cyclists to get across William Frost Way. The sub-standard uncontrolled crossing which had existed for years was blocked off and the footpath down to the bottom roundabout dug up. People not in cars were regarded as an irrelevance, although they were quite a large irrelevance.

One interesting part of the design is the way the new cycle track heading to Aldi passes the uphill bus stop. It just runs through the waiting bus passengers. That they would build something as sub-standard as this is really quite shocking. It matches the bus stop on the other side of the road, but that was built some 20-odd years ago, before the current design standards were introduced.

Once that part of the work was completed, it was possible to take the long detour to go all the way down to the bottom roundabout and cross there, which is a marginally less dangerous location to run through the busy traffic. Helpful signs were placed there to assist cyclists find their way through.

To their credit, and after lots of overtime, the contractors finished the roadworks in short order and the crossing was ready to receive its lights in mid August, but it didn’t happen. Throughout the rest of August, all of September and the first week of October, the site of the crossing sat there, fenced off with a sign pointing pedestrians down the hill to the bottom roundabout. Predictably, large numbers of people chose to chance things by crossing the road at various points along its length. This was clearly a very dangerous situation with a mix of fast moving traffic and running people.

So it came as something of a surprise that, with no prior announcement, a temporary crossing appeared on the site of the proposed toucan on Thursday 9th October. It works reasonably well, and with a wait time of around 25 seconds at each light it took about 1 minute 30 seconds to get across the whole road. A couple of days later though and things seemed to take longer.

For the first time since it’s creation over 20 years ago, there is now a safe way to cross William Frost Way. The number of people using the crossing on this first morning was significant, and it wasn’t a busy time. Even the following Saturday, which was a very busy day, it all seemed to work well, with quite large numbers of people crossing and no huge traffic queues.
So what’s the problem, why hasn’t the proper crossing been built? Various rumours were flying around social media, including fears the new crossing will cause gridlock and problems with the location of the southbound bus stop in relation to the new crossing. But one rumour which might have a better basis in fact is that there’s an issue over connecting the power. Is it possible that they forgot the lights need electricity, who knows?
Clearly, something has gone wrong and the people responsible for the works in Norfolk County Council Highways department are keeping very quiet as to what’s happened. We’ll just have to wait until the Council makes a public statement of some kind to find the truth.
In the meantime there is at last, finally, a safe way to get across William Frost Way, even if it’s a temporary bodge.
TO BE CONTINUED…
______________________________________________________________
Keep up to date with the campaign by subscribing to our free monthly newsletter.






The Dutch gov would have thrown a few million at this and built a beautiful bridge/ tunnel. Not years waiting for Aldi and Persimmon’s lawyers to finally be defeated using even more taxpayer money. Still good news has to be recognised however tiny.