
The Potential
Unlike driving, cycle commuting is actually good for you, physically, mentally and financially – as well as being environmentally and socially sustainable. It’s something we should be encouraging. Norwich should be well suited to cycle commuting, the city is surrounded by many communities within easy cycling distance, but in the county most roads lack even basic footpaths, let alone proper cycle provision.
This situation has come about through deliberate planning decisions over the past 50 years or so, with no thought given for anything other than travel by motor car.
What’s needed?
What we need are cycle routes connecting the surrounding towns to the city. These would be something more akin to roads for cycles which, because of the distances involved, would see relatively high speeds. What does that mean? Sustained high speed for an athletic rider and a fast bike may reach 50Km/h (~30mph), although for most 25-30Km/h (15-20mph) would be a good speed. Compare that to a normal road where motor traffic moves at around 100 Km/h (~60mph).
This means of course no shared-use pavements, but properly designed cycle roads with a minimum of 1.5m wide lanes in each direction, 3m total width, good sight lines, properly designed junctions and so on.
The social benefits would be huge. Unlike roads for motor traffic, cycle roads would go through villages and other communities on the way, bringing passing trade to local shops. They would also be safe for children to cycle unsupervised, allowing them to explore the county and giving them true freedom of mobility.
This isn’t an impossible dream, and as usual we only have to look to the Netherlands to see how it’s done.

How close are we to having anything like that? The answer, predictably, is not very, but we do have some examples of routes that could form the beginnings of cycle commuter roads.
The NDR and Southern Bypass barriers
Norwich has another problem caused by the modern roads built to carry traffic around the city, in the south the southern bypass and in the north the northern distributor road (NDR). These roads have cut many quiet country lanes, concentrating traffic to a few junctions and bridges,
The Southern Bypass (A47)
The A47 is a trunk road, which means it’s owned by central government (National Highways). Many of the junctions have no pedestrian or cycle provision at all, being intended purely for motor vehicles. There are a number of junctions with at least some cycle infrastructure, and being a grade separated road at least you don’t have to cross the high speed mainline.
The NDR
The NDR crosses the major radial roads with at-grade roundabouts, making it all but impossible to cross by bike. There are only a few safe places to cross the NDR for cyclists:
- The Marriotts Way (an overbridge)
- The A140 to Aylsham (although you need to cross the sliproads)
- Buxton Road to Spixworth (an overbridge)
- Newman Road (an overbridge)
- Plumstead Road (under a bridge on a short section of cycle track)
- Middle Road (an overbridge)
The NDR also has a partial set of parallel cycle routes.
What routes do we have now?

There are two usable long distance routes of just about acceptable quality and three potential routes into the city.
Marriott’s Way from Thorpe Marriott

Sustrans National Cycle Route 1, known in the city as the Red Pedalway, runs along the Marriott’s Way, the old M&GN rail line connecting the extremes of the northern Norwich suburbs right into the city. It follows the beautiful Wensum valley which brings a rural feel right into the heart of the city, a truly amazing traffic-free ride.
The Red Pedalway
The Blue Pedalway from Wymondham

Already there, in place and ready for use, is the Blue Pedalway’s southern section; an off-road cycle track linking Norwich to Wymondham, a distance of about 13Km (8 miles). It’s shared use path and has a missing link at Cringleford/Eaton.
Potential “almost there” routes
There are also three potential routes with glaringly obvious missing links.
A140 Holt Road
A proposed extension of the Yellow Pedalway north along the A140 to the NDR overbridge will, if built, connect the villages of Horsham St Faiths and Horsford to the city.
The Western Gateway – Dereham Road
Very much a work in progress, and largely depends on the development of a proper crossing at Longwater.
The Eastern Gateway – Whitlingham Lane
A problem caused by the A47 – The Whitligham Viaduct. There is a “cycle path” of sorts across the bridge which is used by a lot of people, but it’s perhaps the most scary and downright dangerous cycle route in the country.
And finally
No review of the long distance cycle provision in Norwich would be complete without a mention of the Swadeston Road (B1113). When the Southern Bypass was built in the early 1990s, a cycle path was provided under the bypass bridge. It’s still there, never connected to anything, inaccessible and never used.




