Two years of not building for cycling

The past two years have been different because of COVID-19 which has dominated everything and changed so much, not least of all by greatly reducing traffic across the road network. It also covers the period Norfolk County Council (Norfolk CC) has been in charge of transport in Norwich, which includes cycling infrastructure. Because of the pandemic the new schemes built over the past two years have not been tested under normal conditions.

The body responsible is Transport for Norwich (TfN) whose stated aim is:

“To encourage the use of more sustainable forms of transport, such as public transport, cycling and walking, while also improving the capacity of the road network, in particular through the Northern Distributor Road.”

The NDR has been built.

It’s also designed to stabilise traffic levels and as a result improve air quality around the city.

Note “stabilise” traffic means to keep it to the same amount, not to increase it. That would seem to be at odds with the aim of increasing the capacity of the network.

Norfolk CC took over from Norwich City Council (Norwich CC) on 1st April 2020. So, how has TfN’s policy improved opportunities for active travel – cycling and walking – in Norwich?

The Marriotts Way “missing link” was finally completed – Photo Derek

There have been some real improvements to the cycling network: the building of the missing link on Marriotts Way in Hellesdon, the cycle path on the Blue Pedalway past Hethersett and improvements at St Benedict’s Gate being welcome examples, but there have been several major TfN projects which have frankly been terrible, principally:

  • Prince of Wales Road cycle track
  • Tombland
  • Grapes Hill roundabout

These were three major projects in Norwich in areas which urgently needed cycling improvements, unfortunately cycling seems to have been little more than an after-thought on two of them and was totally ignored on one.

Now it’s important to point out that the design and approval of two of the terrible schemes predate the take-over by Norfolk CC and were designed under Norwich CC’s stewardship, although Norfolk CC were responsible for the delivery of all of them.

During the construction of these three projects absolutely no consideration was given to providing cycling routes through the road works, instead “Cyclists dismount” signs were put up. After some lobbying a cycle diversion was signed for cyclists coming from Magdalen Street to avoid the Tombland works, but it took riders on a long diversion.

Prince of Wales Road cycle track

Green Pedalway

Work on this began in 2019, the consultation having taken place the year before under Norwich CC. This was funded by the DfT’s Transforming Cities Fund and was thus intended to include improvements for cycling and walking, which it just about manages to do albeit badly.

What’s wrong with it?

Prince of Wales Road is the direct route from the railway station into the city centre and being one-way towards the station has long been a much-needed missing link for cyclists. What was promised was a contraflow cycle track and this would have the potential to carry a large amount of cycle commuting traffic between the city and the station. Cycle parking at the station has been greatly improved to encourage this cycle commuting.

Norwich Cycling Campaign was involved in the consultation of course and various improvements were suggested by us, all of which were ignored with the exception of cycle access across the triangle of land between Rose Lane and Prince of Wales Road, which was included but was badly designed. Indeed, what was built was very different to the design consulted on and was worse in almost every respect.

The substandard Prince of Wales Road cycle track, complete with trees – Photo Derek

The “cycle track” – which is actually a shared-use pavement – is marked out with a pretty looking tarmac strip that looks a bit like a cycle track but isn’t really. It isn’t continuous, infamously passes over tree roots and can’t be one-way because it’s a shared-use pavement and not a proper cycle track. This raises a special safety issue at St Vedas Street, where cyclists heading downhill see a green traffic light which actually means they have to stop. The track also takes cyclists close to parked cars in a layby, right in the door strike zone – again a particular hazard for anyone cycling downhill.

The green light is for cars turning right into St Vedas Street, not for cyclists following the Prince of Wales Road cycle track – Photo Derek

The entry to the island from Rose Lane is a right-hand junction on a one-way street, requiring cyclists to enter a tight turn at speed in heavy traffic, an entry often blocked by pedestrians and is located immediately beyond a junction for traffic turning into Rose Lane from Prince of Wales Road.

Cycle track on Argicultural Hall Plain
The upper section of cycle track, based on our suggestion for a segregated cycle track – Photo Derek

The second phase of this project, which was designed by Norfolk CC following a suggestion by the campaign was done to a good standard as a proper segregated cycle track.

The project was completed just after the first lockdown and so far has not seen proper traffic levels, but it has received a lot of bad press in the local media.

What’s needed?

Prince of Wales Road is the only cycling route into the city from the east, including the railway station. As such it needs to be capable of serving a high number of cyclists riding in both directions on an off-road high quality cycle track built for capacity. The entry from Rose Lane is totally unfit for purpose. The whole thing needs a total redesign.

Tombland

Green, Pink and Red Pedalways (NCN 1)

What should be the architectural gem in the crown of Norwich, the ancient heart of the city, is instead a major traffic artery, taking a large proportion of inner ring road traffic between Whitefriars and the Foundry Bridge.

In addition to the heavy traffic flow, Tombland almost certainly carries the most cycle traffic of any street in the old city, it’s an important crossroads of the Green, Pink and Red Pedalways and the popular north-south route toward Magdalen Street. As such it has long been in need of proper cycling infrastructure.

An important bit of background: there is a section of cycle track on Tombland built a few years earlier at great expense as a part of the Pink Pedalway project. This 100 metre long cycle track cost hundreds of thousands of pounds because it also included work to re-align the road and improve the environment around the Erpingham Gate – all paid for from a grant intended for providing cycling infrastructure.

The short, expensive and almost totally useless Tombland cycle track in 2015 – Photo Norwich Cycling Campaign

What was built was of limited value for cyclists and was somewhat undermined by the cancellation of the off-road cycle track planned for the Pink Pedalway on Palace Street (cancelled because Norfolk CC objected due to their plans for a rapid bus transit network, which was quietly dropped in 2016). This original cycle track was connected to Princes Street across Tombland with a light-controlled crossing, and also connected up with the diagonal road across the square towards St Faiths Lane, the route of the Green Pedalway. However, it was of little or no use to the vast majority of cycle traffic running north-south along Tombland,

The recent scheme was designed and consulted under Norwich CC but built by Norfolk CC. It was the second phase of the improvement to Tombland and was funded by the DfT’s Transforming Cities Fund. It had the stated aim of providing improvements for cycling and walking and was promoted as such by Norfolk CC. We offered comments to the consultation, again all of which were ignored.

At a later stage we were told of the plans for the removal of the light-controlled crossing on Princes Street, which was done despite our strong objection and seemingly without concern to the safety of cyclists. The stated reason being “to improve traffic flow” through Tombland.

What’s wrong with it?

The latest scheme does nothing to improve access for cycling, indeed it does much to make cycling not only less convenient, but also somewhat more dangerous.

The light-controlled crossing from Princes Street to the cycle track, removed during the “improvements” – Video Derek (recorded during the first lockdown in 2020)

The works saw the removal of the light-controlled crossing and the shortening of the expensive cycle track, so crossing to or from it into Princes Street is very much more dangerous now and the track has been rendered almost entirely useless as a result.

The end of the Tombland cycle track truncated by the “improvements”, forcing cyclists to have to ride in the traffic – Photo Derek

The cycle track no longer flows into the safe route to St Faiths Lane, which has been removed. Cyclists are now expected to ride with the traffic on the road, past a busy layby. Although cycling is allowed across the square, this is strongly discouraged by means of a curb along the edge of the cycle track.

The layby which used to be a bus stop is now for tourist buses and taxis. The bus stops – with space for two buses – have been placed on the congested section of Upper King Street, just prior to the point where cycles have to enter the centre island if they’re heading for King Street. This has made what is still a dangerous traffic-choked street even more dangerous for cycling.

The Tombland scheme was completed in 2021 and has yet to see a full return to traffic flow, the pandemic having greatly cut the number of tourists visiting the area.

Absolutely nothing was provided to improve cycling in the Tombland revamp, beyond painting cycle decals on Queen Street, although none were added on the actual cycle route on Princes Street.

We wrote a critique of this inept scheme before it was completed in 2020.

What’s needed?

Tombland is a busy arterial route through Norwich and the whole area would benefit greatly if this traffic could be removed. However, if that isn’t possible then the area needs big changes. As mentioned, Tombland is a major cycling route yet cycling here is really difficult and has been made more dangerous as a result of these “improvements”.

The light-controlled crossing should be reinstated. Properly segregated cycle tracks are required through the Tombland area and along Upper King Street on both sides of the street. The double bus bay on Upper King Street should be removed, which would provide space for the cycle tracks. Ideally the area around the Erpingham Gate should be redesigned to provide a track for northbound riders heading toward Magdalen Street.

The Green Pedalway is either due to be, or has been, re-routed from the low traffic back-road of St Faiths Lane onto the busy Prince of Wales Road with it’s substandard cycle track. This was decided with no consultation.

Grapes Hill Roundabout

Designed and built by Norfolk CC to increase the traffic capacity of the roundabout on the grounds of reducing delays to buses, it was put out to consultation in early 2021 and approved in June 2021, almost a year after the introduction of the LTN 1/20 design standards and the government policy document “Gear Change”. The scheme did include an improved crossing of Chapelfield Road, but the rest is far below the required standard.

The roundabout is not on a Pedalway route, but is potentially the major access into the city from Unthank and Earlham Roads.

What’s wrong with it?

This is an scheme which prioritises car use over active travel, justified by reducing delays to buses. Cyclists and pedestrians are confined to a single shared-use pavement which at one point is just 3 metres wide. There are many other issues with this scheme, as outlined here.

The substandard shared-use cycle tracks at Grapes Hill roundabout – Video Derek

From Unthank Road, cyclists and pedestrians are confined to a shared-use pavement that narrows from 5m wide to just 3m where Earlham Road joins from the crossing. The route from Earlham Road means following a 3m wide shared-use pavement, over a two-stage crossing (with a confining fence on the island) on a 170 degree diversion around the roundabout.

The whole thing is slow and indirect and understandably many cyclists opt for riding around the roundabout, which has been made far more dangerous because the traffic lights have been removed.

What’s needed?

This was approved by Norfolk CC almost a year after the LTN 1/20 design standards came into force, but it ignores those standards entirely. As a minimum, a proper segregated cycle track from Unthank Road is required, removing the pinch point. But also a crossing of Convent Road that doesn’t include a centre island with fences (which make it difficult if not impossible to use by cargo bikes etc.). The cycle track to Earlham Road is below standard, a shared use pavement with blind bends and needs improving.

Ideally a better route into the city for cyclists coming from Earlham Road is required, either by replacing the narrow footbridge to Upper St Giles or by providing a crossing of Grapes Hill.

Conclusion

Three major schemes have been completed over the past couple of years which all fall way short of the standard we have a right to expect. Tombland in particular is especially bad as this actually increases the danger to cyclists considerably.

These projects were built at a time we were supposedly trying to encourage more people to get around by bike, so not only were they supposed to make conditions safer and more convenient but also to be capable of carrying far more cycle traffic than we see today. These schemes all fell well short of that ambition.

All this would seem to demonstrate at best a total lack of understanding of what is required in the way of cycling provision. During construction of projects like these there needs to be proper provision of cycling routes. “Cyclists dismount” signs are no use to cargo bike riders or disabled riders of adapted bikes.

A significant culture change is required at Norfolk CC.

__________________________________________