Colney Lane roundabout – hostile to active travel

As we reported in an earlier blog, work has started on the Colney Lane roundabout. Cycling, it seems, has been ignored, with the heavily-used Pink Pedalway route being cut in two. Derek Williams reports on the progress of a scheme which is hostile to active travel

“Enhancing pedestrian and cycle links”: nothing could be further from the truth – Photo Derek

__________________________________________________

Note about the “highway boundary”, a term used several times below. This defines the extent of land owned and controlled by Norfolk County Council, which legally forms a part of the highway. If the council wants to build outside of the highway boundary it would need to come to some arrangement, for example by buying the necessary land from the owner. In this case, given the nature of the project and its location, that really should have been a formality, but seemingly not.

__________________________________________________

The northern route

The northern route around the junction

This was conceived in the original plans as the only route cyclists and pedestrians would take to reach the hospital. It is still thought of as the main route and can be split into three sections, shown in orange, red and green above.

The Toucan crossing and shared-use path (orange)

The Toucan replaces the previous uncontrolled crossing of the northern arm of Colney Lane close to the roundabout junction.

The shared-use path is nominally 3m wide but narrows to 2.5m wide for much of its length because of the extent of the highway boundary. Rather than obtain the small amount of extra land to accommodate a 3m path throughout, the path width is restricted. The land required is a grass verge.

The path runs directly along the edge of the carriageway with no buffer strip, meaning cyclists and pedestrians will be unwilling to use the full width of the path. For a 30mph road the recommended minimum buffer width is 0.5m.

For much of its length the usable path width will therefore be only around 2m. But for the limitations of the highway boundary, there is ample land to provide a full 3m wide path with a buffer strip.

The shared-use path leads to the crossing of the western arm of Colney Lane (the access road to the hospital), where cyclists will be expected to dismount.

The triangle island crossing (red)

The dangerous triangle island crossing – Photo Derek

This is an uncontrolled or “informal” crossing of the main hospital access road by way of a triangular shaped island at the roundabout junction, where the inbound and outbound lanes split. An uncontrolled crossing is just a place you can cross the road. It has dropped kerbs and tactile paving, but nothing else, there being no proper crossing control. General traffic on the road has priority.

The road carries a lot of traffic, the hospital being the main destination for many users of the junction. It is reasonable to assume it carries at least as much traffic as the northern arm, where a Toucan crossing was seen as necessary to replace a similar informal crossing.

This is an extremely dangerous crossing. There are very restricted sight lines when crossing from the northern side of the crossing, and when crossing the other way it is hard to judge the speed of approaching traffic coming off the roundabout. Drivers will be concentrating on negotiating the roundabout and will not expect pedestrians and cyclists to be crossing at such a location.

When completed, there will be two lanes of traffic entering the roundabout and the speed of traffic leaving the roundabout will be higher than it was before the works commenced.

This crossing is expected to handle significant amounts of cycle and pedestrian traffic crossing a busy road, yet it is unusable by anyone with vision impairment, mobility issues or poor judgment of speed and distance. Having a “cyclist dismount” section on a major cycle commuting route is unacceptable.

Building a Toucan crossing here would involve land beyond the highway boundary.

The 2m wide path (green)

Cyclists are again expected to dismount (or to remain dismounted), making it unsuitable as part of a serious cycling provision. The path runs directly alongside the road from the triangle crossing to the existing cycle route to the hospital, with no buffer strip between the path and the road. Because no-one will want to walk too close to traffic it will mean there is only about 1.5m of usable pavement space.

The path is restricted to 2m width because of the limits of the highway boundary, Norfolk County Council being unwilling or unable to obtain the extra strip of grass verge needed to build the path to the correct standard. But for the limitations of the highway boundary, there is ample land to provide a full 3m wide path with a buffer strip.

It is also indirect, with both pedestrians and cyclists expected to take an unnecessary detour from the crossing to reach the existing route to the hospital.

The crossing and the narrow path means this route is inadequate to be the main cycling and walking route to the hospital. It is dangerous, and is simply not fit for purpose.

The southern route

The extension to the southern route and the crossing of Colney Lane

The southern cycle route was not going to exist in the initial proposal, but we pointed out that the northern route would be a huge diversion for people cycling from the east and it was agreed to retain this access.

The route consists of three sections: a part of the existing cycle track, the cycle track extension and a new crossing of Colney Lane. It is also planned as a footpath to serve the bus stop, which is to be relocated slightly further east from its current location along Colney Lane.

The cycle track extension (green)

It is intended to divert the existing cycle route which crosses close to the roundabout because the land is needed for road widening on the Colney Lane junction.

The start of this section is the original cycle track, which is reached by crossing the southern arm of the junction (which leads to the staff car park). The crossing, which is currently an uncontrolled crossing, should be upgraded to a parallel (cycle and pedestrian) crossing. There is a substantial grass buffer strip between the cycle track and the road.

The proposed extension is to be another 2m wide path, although it seems it may be made shared use to allow cycling. We are awaiting confirmation from Norfolk County Council on this point.

The new section of path will run alongside the road with no buffer strip, thus making it unlikely anyone would want to walk or cycle too close to the edge, meaning the effective usable width will be around 1.5m. This will be dangerously narrow and quite impractical as a serious cycle route.

The width of the extended path is only 2m wide because of the limitations imposed by the highway boundary, which consists mostly of grass verge and some hedges which Norfolk County Council were unable or unwilling to obtain. The stage two safety audit for the scheme noted that the existing 2m width path “could lead to conflict between cycles and pedestrians at busy times” and recommended the path be widened to 3m. But for the limitations of the highway boundary, there is ample land to provide a full 3m wide path with a buffer strip.

The southern route is likely to prove more popular than the northern route because it’s close to the existing route, and the informal but long established desire line route across the UEA grounds is close by, It also avoids the dangerous triangle island crossing on the northern route.

The Colney Lane crossing by the bus stop (red)

Site of the proposed informal crossing and new bus stop – Photo Derek

The crossing is intended to be an “informal” crossing, i.e. with dropped kerbs and tactiles but with no formal crossing control, so general traffic on the road has priority.

Although the eastern arm of Colney Lane carries significantly less traffic than the western arm, it is not insubstantial. An informal crossing here is substandard for a route that can be expected to attract a large number of cyclists and pedestrians, and a proper controlled crossing is required. A parallel (cycle and pedestrian) crossing may be sufficient although another option would be a Toucan.

Are three traffic lanes really necessary?

It is intended to remove the existing cycle crossing of the eastern arm of Colney Lane in order to add a third general traffic lane dedicated to left turns into the road that leads to the staff car park (the southern arm of the junction). The need for this isn’t clear. All the other arms of the roundabout only have two approach lanes, despite carrying far more traffic. Is this third lane really necessary?

Not building this third lane would allow the existing cycle route to remain as it is, without compromising the other changes on the roundabout. With some upgrade to provide proper crossings of the various arms of the junction, this would seem to be a very much better option than what is proposed, and would be somewhat cheaper.

Conclusion

Having uncontrolled “informal” crossings on three arms of the junction is dangerous, especially so when the junction arms have been widened to speed up general traffic. These should instead be parallel (cycle and pedestrian) crossings or light-controlled Toucans.

Building narrow paths (with gaps in the cycle route requiring cyclists to get off and push) creates conflict between the path users, as highlighted in the safety audit. There is ample land available for building full 3m shared-use cycle tracks with a buffer strip between them and the road, had Norfolk County Council been willing or able to negotiate the small amount of land needed beyond the existing highway boundary.

The scheme isn’t being built for the hospital: it’s purpose is to increase traffic access to the Research Park through the hospital grounds, which is odd because the Research Park has its main entrance off Hethersett Lane. All this will do is add congestion to the access road to the hospital, which includes the A&E department and emergency access.

______________________________________________________________

Keep up to date with the campaign by subscribing to our free monthly newsletter.

7 thoughts on “Colney Lane roundabout – hostile to active travel”

  1. Ask for involvement in the safety audit, stage 3 on completion and discretionary stage 4 ( 1 year) post completion. Insist on a stage 4. were the cycling numbers counted, users consulted? Was LTN 1/20 compliance considered at all? How does it cope with shared pedestrian use in reality? What does Active Travel England think? Pink pedalway users deserve a lot better..

    1. Sure, we’ll ask, but it took an FoI request to get the stage 2 SA, I doubt very much if there will be a Stage 4.

      No, LTN 1/20 wasn’t considered in any way, this design basically dated from 2013, although it was only approved in 2023.

      It’s getting near completion now and although some widening of the shared use paths happened, it looks as bad as predicted.

      1. I don’t think it has been mentioned in any comment so far, but the vast majority of cycle path users are hospital staff / contractors and university staff and students.

  2. Just returned from appointment at the N & N by bike. The Northern Route is potentially a death trap. The view of traffic arriving from the right hand side is effectively non existent. Disturbing

  3. Ok, I am 80 and quite frequently use this route by bike. Crossing at the hospital roundabout is awful and unsafe for me. These suggestions make some improvements but it is still going to be tricky. Please recognise that some of us wobblies actually do need a little extra consideration

    1. Absolutely. Look on all the above as a minimum set of improvements we want to see, yes it could be a lot better that we are asking for.