It remains the position of the Norwich Cycling Campaign that the project now under construction, intended to create a walking and cycling route from Easton village across the A47 junction and William Frost Way, is substandard throughout. However, the crossing of the A47 is by far the most concerning. It’s simply dangerous, as Derek Williams explains

Norfolk County Council are building this scheme in three sections, from Easton village to opposite the Premier Inn hotel, from the Premier Inn across the A47 junction to William Frost Way, and the crossing of William Frost Way.
There are safety issues with the design of the whole route, but the section of most concern is the crossing of the A47. Here we will look at the plans for the section from the Premier Inn to William Frost Way: the A47 crossing.
Norfolk County Council have accepted that this scheme is below the required standard and are now seeking funding for a dedicated cycling and walking bridge across the A47. Of course, we welcome that, but it won’t happen for some years, if it happens at all, and in the meantime it seems this plan will go ahead.
Who will use it?
The project came about simply as a “developer funded planning gain” as a part of the proposed Festival Park housing estate at Easton in 2014 (The 2014 plans) and was to be provided as a safe route to school in Costessey for children of the new estate, as a route for people from the new housing to cycle to the Longwater shops (which would seem to imply the use of cargo bikes) and as a connection to the cycle routes of Norwich via the existing route along Dereham Road. Of course, it will also be used by pedestrians, disabled people on adapted bikes or in wheelchairs and mobility scooters, as well as those riding e-bikes. This had the express aim of reducing car dependency for the new residents of Festival Park.
No consideration was given to the potential wider demands on the route by the planners at the council and this is a significant failing.
In fact the route will also service some of the 5000 mostly teenage students heading from the city to the further education college at Easton, events held at the Showground, people from the existing village of Easton (including their children going to the Costessey school), as well as cycle commuters to the city from the west. This demand will be significant at busy times.
While cycling on the road from Easton to the Premier Inn may be an option for confident riders, few are prepared to risk the A47 junction and those who do are fully aware of its danger. It’s reasonable to assume that the vast majority of people cycling along this route will want to use the junction crossing.
It seems strange that the scale of the repressed demand has never been assessed by Norfolk County Council, but this brief was used to design the route, which led to the substandard plans we first saw in 2021.
The plans
Norfolk County Council insist that the highest priority is to accommodate motor traffic through the junction – traffic largely caused by the adjacent Longwater out-of-town shopping centre. Pedestrian and cycle provision has to be squeezed into what little space is left over. The safety of pedestrians and cyclists is therefore considered a lower priority than providing for motor traffic.
The big problem is the A47 overbridge, which carries the road and this path over the trunk road, running in a deep cutting below. Norfolk County Council consider it vital to have three traffic lanes across the A47 bridge, which has created the pinch point. The traffic lanes will be narrow, down to just 3m, and will have a posted speed limit of 40mph. The traffic over the bridge is substantial and consists not only of cars, but also HGVs and buses. No barrier between the traffic and the pedestrians and cyclists on the bridge is planned.
Because of this, the design will not only be substandard and indirect, but also without doubt, dangerous.
Summary of problems with this proposal

A full description of the proposal can be seen here: Dangerous plans for Longwater that ignore cycling
Get off and push
Cyclists are supposed to get off and push across both of the slip road crossings and continue pushing their bikes over the A47 junction by way of a narrow 2m wide pedestrian-only path. As the path width is measured from the kerb-line and because no-one will want to walk close to the passing traffic, the effective width of the path is only about 1.5m. Cyclists are supposed to get off and push their bikes for a distance of about 200m.
The most obvious problem, apart from the fact that this narrow section would be overcrowded at busy times, is it simply won’t be used in the way the planners are dictating. Get off and push isn’t an option for some cargo bikes, adapted bikes or wheelchairs and mobility scooters, or to be honest teenagers and children, which is a problem. The route is catering for a large proportion of children and teenagers – as well as people riding reasonably long distances. It obviously has to be designed to be ridden safely.
Although it may be the case that there is no alternative to this difficult pinch-point, it has to be safe. Any pinch point, if it has to exist, must be as short as possible and be properly protected.
August 2023: We met with the council to discuss our safety concerns
In August 2023 after repeated requests, we finally had a meeting with senior officers from the council Highways department to discuss these concerns about safety issues.
When a project such as this is proposed, it has to undergo a series of Road Safety Audits (RSAs). There are two which take place before construction known as Stage 1 and Stage 2 (RSA1 and RSA2). They are nominally independent, but are usually conducted in-house by Norfolk County Council.
Stage 1 safety audit of December 2021 (PDF download)
Stage 2 safety audit of March 2023 (PDF download)
We were familiar with RSA1, but not RSA 2, at the time of our meeting with the officers and so we were not aware of its contents, although the officers were aware of it. As it happens, most of the issues we raised in the meeting were covered in RSA2, so in large part we were echoing the concerns of their safety assessor.
Sometime later, in October 2024 – well over a year since our meeting – we obtained RSA2 through a Freedom of Information request.
Crossing the bridge
On the A47 overbridge the biggest dangers we identified are:
- HGVs mounting the pavement. The running lanes across the bridge are narrow and so traffic will be travelling close to the kerb. Pedestrians and cyclists will be in the blind spot for drivers of HGVs.
- Collisions between walkers, cyclists and motor traffic caused by people falling or stepping into the roadway as they pass each other on the narrow path.
- As mentioned in RSA1, cyclists falling over the low fence of the balustrade onto the A47 below.
These issues mean the overbridge would feel, and would actually be, a very dangerous place.
Our proposal
As Norfolk County Council insist there must be three traffic lanes over the bridge, there simply isn’t space to provide an adequate shared-use path, and as stated above the usable space will only be about 1.5m.
We consider that the route, substandard and inadequate as it is, has to be safe for the way it will be used, accepting that people, especially young people and children, will ride across, as the RSA1 acknowledges.
The footpath will be in the blind spot of the drivers of HGVs and it would be easy for a vehicle to mount the kerb. To protect against traffic mounting the pavement we suggest the use of “containment kerbs”, these are high profile kerbs routinely used in such locations, including on nearby William Frost Way.

To prevent pedestrians and cyclists stepping or falling into the road the containment kerb can be topped with a simple guard rail fence, as seen in several locations around the city.

To prevent falls on to the A47 below the bridge, we support the suggestion in RSA1 to install a higher (1.5m tall) balustrade to the bridge.
There are other locations where containment kerbs should be used and some other issues worth considering (see the detailed commentary below).
Our proposal for the A47 crossing

Assuming there really is no alternative to providing three traffic lanes over the A47 bridge, that it isn’t possible to take some of the unused 1.4m wide “path” on the far side of the bridge and that there really isn’t any other way to provide a proper cycle track over the bridge, we propose:
1: The crossings be made toucans, instead of puffins, i.e. proper cycle crossings, and the paths from the crossings to the A47 bridge be a minimum 3m wide, designed as shared-use paths.
2: The narrow pinch point, if it has to exist, be as limited as possible and confined to the bridge only. This could be signed “cyclists dismount”, but must be designed so as to assume compliance with the dismount will be low. It needs to prevent traffic mounting the path, people falling or stepping in to the road and people falling from the bridge on to the A47 below.
Such a design is third rate and far below the minimum standard cycling infrastructure should be built to, but it would address the worst of the safety issues the plans present.
We urge Norfolk County Council to support the safety measures we propose along with those mentioned in the RSA2.
______________________________________________________________
Detailed commentary on the stage 2 safety audit (RSA 2)
The stage 2 safety audit was carried out in March 2023 and makes for truly disturbing reading. What follows is a detailed look at the recommendations and the worrying responses of the designer.
An RSA is supposed to be signed off by three people – the auditor, the designer and network management. RSA2 has not been signed off by network management (i.e. Norfolk County Council Highways), nearly two years later. Download RSA 2 (PDF)
The audit identified most, but not all, of the issues we had already raised, as well as some additional issues. There are 10 points of interest:

1: Collisions with NMUs on the A47 eastbound approach to the puffin crossing (2.4)
The auditor proposes that the length of 65 PSV (Non-skid) surfacing be increased from 55m to 80m to ensure vehicles can stop.
The designer’s response is:
“The minimum required is 50m. The exact length has been determined based on the site and layout.”
We say if this would improve safety, why not do it?
2: Replace puffin crossings with toucans, limit narrow path to the overbridge only (4.1)
The auditors suggested the proposed puffin crossings should be made into toucans, the path from the crossings to the overbridge widened to 3m and the “cyclist dismount” section reduced to simply across the overbridge, which they suggested would improve compliance.
The designer’s response was:
“Cyclists should use the footway as intended by dismounting before using the puffin crossings. The path leading up to the crossing north and south of the overbridge is 3m wide.”
Our view is that the designer’s response is concerning in the extreme and we strongly disagree with it. The auditor is correctly concerned with what will happen in the real world, the way this infrastructure will be used.
We strongly endorse the auditor’s suggestion to provide full 3m wide shared-use paths on the approaches to the bridge, confining the narrow section to the bridge itself.
We were told informally this was going to happen following our meeting with the council in August 2023, but we have not seen it confirmed.
3: Layby and camera pole blocking path (4.4)
There seems to be some confusion over the service lay-by. Proposals for the William Frost Way crossing show a service bay located on the exit from the Longwater shops while the stage 2 safety audit (4.4) seems to think this will be relocated to a point on the existing shared-use path near the top of the hill on William Frost Way.
Neither of these locations is suitable as both would block the route. The CCTV pole and lay-by must be relocated and the path kept clear.
4: Bridge Parapet (Page 5 Intro)
RSA1 accepted that people would ride bicycles over the bridge and recommended increasing the height of the parapet to prevent falls on to the A47.
The designer rejected this as the “proposals do not provide for a cycleway on the overbridge therefore the parapet height is adequate for the purpose intended.”
This is very concerning. It is known and understood that some cyclists will ride across the overbridge. Refusing to provide the extra safety feature on the grounds that the low fence is “adequate for the purpose intended” is irresponsible.
Our view is that the design of the crossing must place safety as the number one priority and that the parapet height should be increased. The route must be safe for the way it will be used by the public in real life.
5: Kerb overrun by HGVs / pedestrians stepping or falling into the road on the overbridge
This was not identified by the stage 2 safety audit but is a very real and obvious risk. See our proposal above for containment kerbs and a fence to prevent non-motorised user and traffic collisions.
6: Narrow pavement / risk of falling down steep embankment (4.2)
The junction is built on embankments with steep sides never designed to accommodate a cycle route, the path will come close to the steep slope and the auditor suggested there is a real risk of cyclists and pedestrians falling.
Designers comment: “Would dis-proportionally increase the cost of the scheme.”
The on-slip carriageway is proposed to be narrowed to one lane on the approach to the crossing by means of carriageway hatching, so it’s possible to take some land from the carriageway beside the on-slip, which would not only provide space for a full 3m shared-use path beside the slip road, but also a 50cm buffer between the path and the road.
In the plans, the crossing extends over two lanes of the slip road, despite the right hand lane being hatched out. We would also like to suggest that the crossing here be narrowed so as to cross the one operational lane, with the waiting area on the north side moved into the hatched-out section of road. As mentioned in point 2. above, the crossing should be a toucan, not a puffin.
A fence should be provided along the edge of the steep slope of the embankment as a simple way to prevent falls.
The path on the other side of the bridge toward the off-slip crossing seems wider as it presently contains the service bay and CCTV camera pole mentioned above.
7: Proposal to add extra zig-zags to increase conspicuity of crossing (5.6)
The auditors expressed concerns about the conspicuity of the proposed crossing of the on-slip road. They suggested adding more zig-zags to the controlled area.
The designer responded: “The purpose of zig zag markings is not to enhance the crossing conspicuity. The current design is standard with 8 2m marks either side. 9 marks either side is permitted but an odd number of marks is not normal practice. 10 marks would extend into the roundabout.”
Our view is that seems another response from the designer that’s difficult to understand. If 9 zig-zags would improve safety here and is permitted, then why not do it?
8: Problem – HGVs overrunning the cycle track (2.2)
There are several tyre tracks in the grass verge, where the path is intended to run, providing clear evidence of vehicle overruns. This is another place where containment kerbs would be the better choice.
The designer’s response is to state HGVs can negotiate the bend, but suggests replacing kerbs with half battered type, which would not provide real protection from overruns.
Such kerbs have already been used on William Frost Way, for example on the roundabout by-pass adjacent to Next.
9: Hotel entrance crossing (3.4)
The stage 2 safety audit identifies the danger with the proposed cycle track across the mouth of the junction and recommends the radii of the junction mouth be reduced. The designer’s response was:
“This is outside the scope of the scheme.”
The designer is wrong, this crossing is very much a part of the scheme. The proposed junction crossing as designed is dangerous for the reason stated by the auditor. The crossing should be built to LTN 1/20 standards (the national design standard) as a set-back crossing away from the junction mouth, on a raised table across the entrance road. There is space within the highway boundary to provide a set-back crossing of the hotel entrance.
10: Bus stop to be moved west of the island (2.1)
The auditor identifies a problem with the location of a bus stop immediately west of the proposed crossing, which could lead to drivers overtaking a stationary bus to pass the crossing island on the wrong side of the road.
The recommendation from the auditor is to relocate the bus stop slightly east of the crossing and the designer agreed. This would put the bus stop close to the hotel entrance and opposite the entrance to the Showground, in the hatched area reserved for turning vehicles and it would place the bus stop on the shared-use path, causing conflicts between pedestrians, cyclists and bus passengers. Relocating the bus stop slightly further east would seem to be unworkable. If the bus stop was located west of the crossing this would avoid conflicts between pedestrians, cyclists and bus passengers.
Summary
The stage 2 safety audit raised some important safety issues which were dismissed for highly questionable reasons, which highlight the limitations of the proposed scheme. Norfolk County Council have remained tight-lipped as to their intentions, which is no way to approach such an important project.